Simkiss Control Systems have been successfully working in the rail sector for over 8 years. We have in depth knowledge of the NWR specifications and requirements and have delivered numerous projects.
With a team of experienced HV/LV switchgear engineers, the following can be offered:
- Installation, integration and commissioning services
- Gas insulated switchgear experience (ABB & Siemens)
- Substation decommissioning and removal
- Bespoke packaged substation design
- Containerised substation works (specification, design, switchgear installs, auxiliary equipment installation, interconnecting wiring, heating/lighting/small power, test and cold commission)
- Full primary and secondary testing prior to energisation
- SMOS pallet modifications, build, install, test and commissioning
- Complete document management process for CrossRail (including all forms of submission throughout design life cycle, Project Wise, V8i Microstation and Form Z ‘as built’ submissions)